A、Functional features 

 Transformer empty load characteristics tester, adopting digital synchronous sampling technology, accurate measurement three-phase electric equipment of voltage, current, power, power factor and other parameters of the true RMS, with measuring speed, high precision and easy, lightly, beautiful, etc. Specially applied to power transformer power detection, this instrument can be replaced in nine to the same level, is the traditional pointer instrument power testing instruments ideal old products. 
May adopt 240 * 128 lattices.the LCD screen also showed a three-phase current and voltage, low voltage side of voltage, power, power factor parameters. 
2 measurable various types of transformer no-load current, voltage, no-load loss, short-circuit short-circuit loss. 
3 wide linear range, readings repeatability and stable performance. 
4. Ensure power factor 0.000 ~ of 1.000 accurate measurement, especially suitable for the low power factor load testing. 
⒌ convenient latch can guarantee the measurement data simultaneity and convenience of operation. 
6. Voltage range to amount to limit: voltage measurement to maximum 750V, don’t switch gear will ensure accuracy. Won’t because voltage gear to choose the wrong instrument itself has damaged. 
7. Big screen, high brightness liquid crystal display (LCD), all Chinese menu and operating hints realize friendly human-machine conversation, touch-key make easy operation. 
8. The user may at any time will test data through the micro printer to print out the results. 

B、Technical indexes 
1, input characteristics 
Voltage measurement range: 0 ~ 1200V wide quantity limit. 
Current measurement range: 0 ~ 80A internal all automatically switched range. 
2, the accuracy 
Voltage, current, + 0.2% 
Power: + 0.5 per cent (Cos Φ > 0.1), + 1.0% (0.02 < < 0.1) Φ Cos 
3, working temperature: - 10 ℃ ~ + 40 ℃ 
4, insulation: (1), voltage, current input to the cabinet of insulation resistance Ω 100M p. 
(2), work power input to a husk 2kV (inherit power frequency between the RMS) and lasted 1 minute experiment. 
5, volume: 38cm x x 28cm 15cm 
6, weight: 3kg 
C、Structure appearance
Instrument by the host and accessories box two parts, including host is the instrument, the core of all electrical parts in host internal, outside its box adopts high-strength aluminum chassis, durable, fittings box used to hold test wire and tools. 
1, panel decorate 
Panel arrangement (figure 2) 


















Figure 2, panel arrangement 
As shown in figure 2 shows: the most left from top to bottom in turn for characteristics test inputs A, B, C j output terminals A, B, C j grounding terminals. Attention during operation must ensure that connect the terminals of the right, or else it may affect test results and even damage the apparatus, For the LCD panel upper, LCD below for printers. Most the right side is the power socket and switch, below is operating buttons. 
2, keyboard that 
Keyboard consists of six key, respectively is: cancellation, -, ↑, press, the confirmation, the restoration. 
Each key function is as follows: 


↑、↓、→key:The up and down or so key ;
in main interface to move the cursor, make its point to need to undertake project function bar (function bar 
Reverse white shown). 
 key in the active testing project preferences function and passive project Settings in the LCD used to move 
The cursor, make its point to need to change the parameters (including: high rated voltage transformer type, points after gear, rated voltage and rated current, voltage transformer ratios, electrorheological ratio, temperature, current calibration index, etc.). 
 key in coefficient calibration function used to change measuring coefficient, and can be used to regulate the current 
The time and date. 
 key in the record browsing in the LCD used to scroll through records. 
 button around in the active testing project preferences function in the LCD used to toggle optional projects, such as high 
Rated voltage options include: 35kV, 110 kV consumers 10kV, in these gear in consecutive switching, choose to numerical; In passive parameter Settings in the LCD when the cursor points to the current temperature option, used to toggle need calibration to rated conditions of temperature value. 
 button around in coefficient used to move the cursor calibration function, make its point of need adjustment coefficient of choice 
Item. 

Determine the key : in the main menu click here namely into the current toward the option. 
Reset button: return key, push down this button are direct return to the main menu, If the input parameters under the state press 
Cancel button: in the input parameters, and click "cancel" key input parameters effectively. 
D、LCD interface 
LCD display interface mainly has five function interface, respectively introduced detailedly below. 

1, boot interface shown below. 









2, at boot interface under press any key can enter the main menu, the main menu pictured below: 
There are five main menu option, respectively is: parameter setting, single-phase short circuit, three-wire, short-circuit, single no-load, three-wire, racing. When the cursor point which option, which icon becomes inverse white shows, press the up and down or so key can change the cursor pointing options. At this point, press "sure" button to enter the selected functions screen. 
3, parameter Settings screen shown below: 









Figure can be seen in the first act the presenting bank, the presenting bank tip ’key mobile options, or so key to change the current options’ as shown, when fluctuation buttons can be to move the cursor to other options, a total of six lines represent six parameters, including: transformer capacity, high rated voltage, low rated voltage, wiring way, transformer type, the current temperature, the cursor point to which one, on which item change, figure JiuZhong selected items as transformer capacity, press the button around can change the current transformer capacity numerical. Figure ShiZhong selected item for current temperature, Press the button around can change the current temperature numerical, 
The parameters specific instructions are as follows: 
Transformer capacity: being measured the nominal capacity transformer, unit value KVA, 
High rated voltage: being measured the high-pressure lateral rated voltage transformer, the unit KV, 
Low rated voltage: being measured the low voltage side of rated voltage transformer, the unit KV, 
Wiring way: refers to be measured the inter-connection mode transformer (i.e. coupling category), including Y/Yn0, Dyn11 / Yzn11 several ways, 
The current temperature: current test environment temperature, used for transformer short-circuit test (measuring short-circuit loss) will test power testing results correction to 75 ℃ (short-circuit test rated conditions for 75 ℃), don’t do this calibration input 75 can (correction formula is: PK75 = K x PK, including K represents resistance temperature coefficient, the algorithm for K = (235 + 75) / (235 + t), type of t test, when actual temperature to impedance voltage calibration, also according to the formula with actuality, automatic correction formula is as follows: 
 
Type: UKT represent the current temperature measured impedance voltage percentage, 
PKT represent the current temperature measured short-circuit loss, 
SN said tested transformer rated capacity; 
Transformer types: refers to be measured transformer forms including: S7, S13 S9 and S11, FJ, SJ, and JB64, JB73 etc; 
Correction factor: generally choose 2.0 can. 
Ed: refers to the number of subjects were transformer Numbers. 
4, single-phase short circuit display as below: 









Single-phase short circuit current screen shows the actual test voltage Ua, current Ia and power Pa (conversion voltage and current transformer ratios coefficient, but without calibration); Also showed that the correction of short circuit voltage Uk, after correction of power Pk (where the correction refers to the rated current conditions short-circuit test will measure the power loss and no-load current correction to rated current conditions number). Single-phase short-circuit test is mainly used to test single-phase transformer short-circuit loss. After long press measurement confirmation button, the cursor to print characters, then press print keys hit test data. 
5, three-wire, short-circuit display as below: 












This screen shows current respectively of each phase of the actual voltage, current, power, and each phase voltage average U, after correction of short circuit voltage percentage of Uk %, after adjusting for load loss Pk (non rated current conditions short-circuit test will measure the power loss and short circuit voltage adjustment for rated current conditions number). 
After long press measurement confirmation button, the cursor to print characters, then press print keys hit test data. 
6 and single-phase no-load display as below: 




  

                          
Single-phase approach to measure no-load will output AB received transformer AB two-phase can. After long press measurement confirmation button, the cursor to print characters, then press print keys hit test data. 
7 and the third no-load shown below: 











Three-wire no-load test process: a, connect well test line, with pressure regulator slowly pressor, until it reaches the rated voltage value; B and press ok button, the instrument will test results and the determination of the results calculated. One shown above is to test process of real-time data, unceasingly in the refresh, Includes every phase measured voltage, current, power, three-phase average voltage, idle current percentage, no-load loss, etc. After long press measurement confirmation button, the cursor to print characters, then press print keys hit test data. 


E、Method of use :

Firstly, the basic concept 
No-load test: from a winding transformer (general from second low voltage side) rated exert sine wave frequency rated voltage, the rest of the winding open and measuring idle current and no-load loss. If the test condition is limited, can not reach the rated voltage power supply voltage, can be in the rated voltage condition test, this experiment method error is larger, only commonly used to examine the transformer is trouble-free, only the rated voltage of the test voltage reached 80% above just can be used to test no-load loss. 
The short-circuit test: will transformer low-pressure large current side artificial short connection, from one side of coil voltage high rated points within the ventilation with rated frequency test voltage, make the winding of current reach ratings, and then measured input power and applying voltage (namely short-circuit loss and short circuit voltage and current value). 
2, test methods 
According to different test items below separately introduced: 
(1), three-phase power measurement of transformer no-load loss: will not test the transformer open and referring to the following figure way wiring 
 
Figure 19 three-phase power measurement transformer no-load loss 

(2), three-phase three-wire power transformer short-circuit measurement loss: from transformer hv lateral exert three-phase test power, low voltage side using the dedicated short wires good short sub image below for wiring. 
 
Figure 21st three-phase power transformer short-circuit measurement loss 

Note: here we adopt method is equivalent to previous two power meter method, voltage measurements at UAB, UCA and UCB three-phase voltage values, the results for the average; three-phase Power loss only measuring PAB and PCB two-phase power, total loss as two phase power loss sum. 
F、printing function

Each done a test, hold confirmation button two empress, shadow moved to print characters, then click ok button to print out measurement data. 
G、the matters needing attention

1 and when measuring process must not touch the metal parts of the test line, to avoid being electrically damaging. 
2, measuring wiring must strictly according to the instructions, otherwise the consequence is proud. 
3, test carefully before check Settings parameters correctly. 
4, had better use have ground power outlet. 
5, cannot be in voltage and current under the condition of limited excessive work. 
6, short-circuit test, the pressure side short sub must be good, otherwise, it will have influence on the result of the test. 
7, do the short-circuit test, if high-pressure or medium voltage side with ring current transformer _ casing, before the test current transformer of secondary must be short-circuited. 
8, experimental wiring job must be test line grounding conditions, prevent inductive voltage electric shock. All short-circuit, grounding and fuses should have enough section, and must connecting firm. Test organization work to tight, communication is smooth, to ensure safety test work smoothly. 
 
Appendix 3: 
Consumers 10kV (6kV) series of distribution transformer technical parameters
Nominalcapacity (kVA)    High rated current (A)    Low rated current (A)    No-load loss(kW)    Load loss (kW)    Impedance voltage (%)    Idle current (%)
            S7    S9    S11    S7    S9    S11    S7    S9    S11    S7    S9    S11
                0.04            0.18            4.0            2.85    
                0.05            0.21            4.0            2.72    
                0.06            0.3            4.0            2.65    
                0.1            0.5            4.0            2.6    
30    1.732    43.3    0.15    0.13    0.1    0.8    0.6    0.6    4.0    4.0    4.0    2.8    2.1    2.1
50    2.887    72.17    0.19    0.17    0.13    1.15    0.87    0.87    4.0    4.0    4.0    2.6    2.0    2.0
63    3.637    90.94    0.22    0.2    0.15    1.4    1.04    1.04    4.0    4.0    4.0    2.5    1.9    1.9
80    4.619    115.5    0.27    0.25    0.18    1.65    1.25    1.25    4.0    4.0    4.0    2.4    1.8    1.8
100    5.774    144.3    0.32    0.29    0.2    2.0    1.5    1.5    4.0    4.0    4.0    2.3    1.6    1.6
125    7.217    180.4    0.37    0.34    0.24    2.45    1.8    1.8    4.0    4.0    4.0    2.2    1.5    1.5
160    9.238    230.9    0.46    0.4    0.29    2.85    2.2    2.2    4.0    4.0    4.0    2.1    1.4    1.4
200    11.55    288.7    0.54    0.48    0.33    3.5    2.6    2.6    4.0    4.0    4.0    2.1    1.3    1.3
250    14.43    360.9    0.64    0.56    0.4    4.0    3.05    3.05    4.0    4.0    4.0    2.0    1.2    1.2
315    18.19    454.7    0.76    0.67    0.48    4.8    3.65    3.65    4.0    4.0    4.0    2.0    1.1    1.1
400    23.09    577.4    0.92    0.8    0.57    5.8    4.3    4.3    4.0    4.0    4.0    1.9    1.0    1.0
500    28.87    721.7    1.08    0.96    0.68    6.9    5.1    5.1    4.0    4.0    4.0    1.9    1.0    1.0
630    36.37    909.4    1.3    1.2    0.81    8.1    6.2    6.2    4.5    4.5    4.5    1.8    0.9    0.9
800    46.19    1155    1.54    1.4    0.98    9.9    7.5    7.5    4.5    4.5    4.5    1.5    0.8    0.8
1000    57.74    1443    1.8    1.7        11.6    10.3        4.5    4.5        1.2    0.7    
1250    72.17    1804    2.2    1.95        13.8    12        4.5    4.5        1.2    0.6    
1600    92.38    2309    2.65    2.4        16.5    14.5        4.5    4.5        1.1    0.6    

公司名称:上海苏特电气有限公司
公司地址:上海市共康路1018号
联系电话:021-56479692 66241190
传  真:021-56477760 56422486
邮政编码:200443
手  机:13918091972
联 系 人:徐寿平
公司网址: 
Email  :sute@56412027.com 

北极星光伏商务通微信

北极星电力商务通微博

扫一扫
关注北极星商务通官方微信公众号及微博,及时获取最新资讯。

北极星电力网声明:此资讯系转载自北极星电力网合作媒体或互联网其它网站,北极星电力网 登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。文章内容仅供参考。

供应商档案

上海苏特电气有限公司
企业认证: 企业已认证已认证
所在地区: 上海
主营产品:

生产核销售高压测试仪器仪表,直流高压发生器;直流电阻测试仪;试验变压器;大电流发生器;回路电阻测试仪;真空度测试仪;绝缘油介电强度测试仪;继电保护测试仪;介质损耗测试仪;无线核相器;高压核相仪;耐压测试仪;安全帽,中英文警示牌,高压绝缘钳,携带型短路接地线,防电弧服,防毒面具,接地线接地棒,接地棒,声光高压直流验电器,XJ圆口螺旋压紧式接地线操作棒,GD伸缩声光验电器,sute安全工器具柜,绝缘手套 绝缘靴,红外线测温仪,高压线路拉杆式测流仪,局部放电测试仪,钳形接地电阻测试仪,直流放电棒,千伏表,直流耐压仪,绝缘油耐压试验杯,直流电接地探测装置,变压器感性负载直流电阻测试仪,电力变压器损耗参数测试仪,电机故障诊断仪,高压数字微安表,矿用电缆故障测试仪,全自动电缆热补机,苏特耐高压线,苏特测试钳系列,曲线吊线器总成,铜双线夹,电阻柜 滑线电阻器,三相多功能伏安相位仪,笔形温度计/笔形温度表,可程序电源供应器,全自动变比组别测试仪苏特(上海)电气有限公司

收藏此企业